Budget validation
Check whether a revised plan still matches rate tables, fringe logic, labor assumptions, and production-specific constraints before the budget moves downstream.
Olivine is strongest where a production change crosses multiple systems and the cost of being wrong compounds fast.
Check whether a revised plan still matches rate tables, fringe logic, labor assumptions, and production-specific constraints before the budget moves downstream.
Validate whether timecards, jurisdictions, union rates, turnaround rules, and withholding assumptions are coherent before the payroll package is submitted.
Trace permit, insurance, labor, safety, creative, and budget consequences when a location changes or a site-specific assumption breaks.
Verify that the current production state still matches what policy documents and permit filings actually cover.
Branch multiple options, compare what breaks under each one, and decide based on grounded consequences rather than intuition alone.
Bring producers, payroll, and studio-side decision makers into the same consequence map before an approval becomes a downstream problem.